Willow

Special Announcements

09.03.26

WVIC Press Release - Water Levels and Drought

Area Reservoir Levels Expected to Decline Further as Drought Conditions Continue – September 3, 2026...

The Willow Development, one of the five engineered reservoirs in the system, is located on the Tomahawk River in Oneida County near Hazelhurst, Wisconsin. The high-head dam is composed of a concrete gated spillway, two earthen dikes (left and right main), one on each side of the spillway, that span the original river channel, and three detached dikes (Doberstein, North, and South), with Willow Dam Road running along the top of the Main dike and North dike. The Tomahawk River flows 21.2 river miles before entering WVIC’s Rice Reservoir. The area surrounding the facility contains a popular tailwater fishing area, access for down-river canoeing and kayaking, and a boat landing for the reservoir adjacent to the dam, with the greater area around the Willow Reservoir being preserved and protected as the Wisconsin Department of Natural Resources Willow Flowage Scenic Waters Area offering miles and miles of undeveloped shoreline, hundreds of islands, acres of boating and fishing, and dozens of remote and rustic camp sites. 

Map WOW
Location: Oneida
Max Water Level
(Ft. NGVD):
1529.35
Area (Acres): 6392 acres
Gross Storage
(MCF):
2924
Max Depth
(Feet):
30ft.
Year Built: 1926
Minimum Water Level
(Ft. NGVD):
1510.85
Usable Storage
(MCF):
2809
Shoreline Length
(Miles):
127mi.

Amenitities:

Boat Landing
Boat Landing
Access
Access
Restrooms
Restrooms
Picnic Area
Picnic Area
Swimming
Swimming
Campground
Campground
Hiking Trail
Hiking Trail
Bicycle Trail
Bicycle Trail
Interactive Display
Interpretive Display
Shore Fishing
Shore Fishing
Canoe Portage
Canoe Portage
Pier
Pier

Willow Hourly Data

Willow Water Levels and Gate Report

Willow Water Level Report

Willow History

WOW 1947 0048 WOW 1947 0044 WOW 1946 0066 sm
<<
>>

The Willow Reservoir is one of the two reservoirs developed within the Wisconsin Valley Improvement Company system during the 1920’s. 

WVIC completed the first planning surveys of the area that would become the Willow Reservoir and developed plans for the dam in 1925, then applied for a construction permit from the Wisconsin Railroad Commission, a predecessor to the Wisconsin Public Service Commission, to build the Willow Dam on January 7, 1926, received approval on May 10, and began construction of the dam later that same year.  Construction of the concrete dam with two steel deep gates, one steel roll gate, hand-operated traveling gate hoist, and wood deck roadway bridge was completed early in 1927, and the gates were closed on April 30 to begin filling of the reservoir. Authorization from the Wisconsin Public Service Commission to raise maximum water level an additional three feet came in 1932 vertical extensions and support framing was added to the gate that same year.  The original hand-operated gate hoist was replaced with a gasoline engine in 1936, as well as a complete replacement of all three steel gates to better accommodate the earlier three-foot rise in the reservoir, with the concrete piers and abutment walls being raised three feet and adjustments to the hoist track that year also. The Wisconsin Public Service Commission authorized an additional rise in the maximum water level of 0.5 foot on May 25, 1942, with WVIC adding a simple wooden vertical extension at that time, eventually replacing them with steel in 1955. The gasoline hoist engine was replaced with an electric motor in 1952 and then in 1962 the entire hoisting drum assembly was completely redesigned by reusing portions of the Spirit Dam hoist that had originally been used by the Wisconsin Public Service Corporation while reusing the Willow electric motor. The next major change wouldn’t happen until 2007 when the original roadway bridge, first wood and eventually concrete, portions of which rested on the dam structure, was removed and rebuilt utilizing its own abutment wall design to completely span over the dam structure. Other concrete maintenance work has been completed over the last number of decades to repair some surface deterioration with little additional change to the structure and additions and modifications have been made to the earthen dikes. The latest major project in 2019 involved replacing the electric hoist that traveled from gate to gate on a track to new dedicated electric hoists on all three gates that no longer need to be manually pushed into place to operate different gates, saving time and reducing the physical toll of moving them by hand.

Land Use and Recreation

WVIC lands are generally open to the public without discrimination.  There are a few areas near our dams and infrastructure where public access and use is prohibited for your safety.  We do have guidelines for recreational activities, like hunting, fishing, boating, trapping, and more.  Learn more about the rules and guidelines for using WVIC lands. 

Learn More >>