The Wisconsin Valley Improvement Company started life in 1907 as a pioneering experiment in natural resource stewardship.  The stated purpose of our charter pledged the company to build and maintain storage reservoirs that would level the peaks and troughs of the hydrological cycle in order to provide “as uniform a flow as practicable” in the Wisconsin River. It was a goal requiring unprecedented cooperation among individual users of the river water, the state government and, ultimately, the people of the valley. From timber dams to concrete spillways, WVIC has a vast history in the Wisconsin River Basin for more than 100 years.

WVIC Historical Timeline

1880

Before the existence of Wisconsin Valley Improvement Company, the many logging operations in the vast Northwoods timberlands operated as individual entities, with water flows and log driving activities unknowingly affecting other companies and the public.

1880 0001

1900’s

A typical pre-WVIC log-driving “improvement company” dam located in the Wisconsin River headwaters area on a main northern tributary. A wooden dam would be built to raise the water level of a lake and then the dam would either be completely opened or would utilize flumes to let logs float downstream to lumber mills. 

1900 0001 1

1907

While the concept of a coordinated effort for all logging dams to work together on releasing water began around 1895 by William Bradley, the founder of Tomahawk, WI, the final creation of Wisconsin Valley Improvement Company didn’t happen until the passage of Chapter 335 of the 1907 Laws of Wisconsin language by the Wisconsin Legislature with the mandate to provide “as uniform a flow as practicable in the Wisconsin and Tomahawk rivers” for “all public purpose”.

1908 0001

1910's

It was identified early in WVIC’s existence that simply having control of the small logging dams scattered throughout the Northwoods would not be enough to control flooding events that plagued the Wisconsin River Valley and annually created havoc on riverside industry and personal property.

1911 0031

1911-1914

Developing larger, engineered reservoirs to help control flooding and to even out overall Wisconsin River water flow began in 1911 with the creation of the Rice Reservoir Dam located north of Tomahawk, WI, where the Tomahawk River, the Rice River, and the Little Rice Creek converge. 

1914 0013

1920's and beyond

As the railroad replaced the river to transport timber, a new use for a steady flow of water came into prominence. Hydroelectric plant dams were created to power lumber and paper mills, along with providing electricity to an ever growing population along the Wisconsin River. 

1924 0007

1930's - 1940's

A single engineered reservoir wasn’t enough. Through the 1930’s, WVIC developed four additional large reservoirs on the Wisconsin River (Rainbow Dam), the Tomahawk River (Willow Dam), the Spirit River (Spirit Dam), and on the Big Eau Pleine River (Big Eau Pleine Dam). (Rainbow Dam pictured, 1935)

1935 0060 1

1910's - 1940's

Timber becomes concrete. Between 1910 and into the 1940’s, all of the wooden dams that WVIC acquired from various logging companies were reconstructed into concrete structures with steel gates used to control the flow of water. (Twin Lakes Dam pictured, 1947)

1947 0061

1950's

Proactive internal WVIC research and study experiments helped to understand many meteorological elements, like measuring snowfall and precipitation throughout the Wisconsin River Basin and estimating evaporation on the reservoirs, as seen in this photo. 

1950 0078 15

1960's

A famous recreation amenity gets a major upgrade.  The Burnt Rollways Boat Hoist connecting the Three Lakes and Eagle River Chains of Lakes was completely reconfigured and rebuilt, continuing boating access through the world's largest continuous chain of lakes.

BUR1962 1963

1970's & 1980's

Becoming experts in fisheries and water quality on WVIC reservoirs. Prior to many federal and state environmental regulations and testing requirements, WVIC began conducting its own fish population and aging studies, as well as a great deal of field collection and water quality testing throughout the entire reservoir system utilizing our in-house laboratory. 

LMN1970 1980

1990's

A decade of renewal, new technology, and ensuring everything is operating and safe. WVIC's Federal Energy Regulatory Commission (FERC) license to operate the dams and reservoir system was renewed after hundreds of hours of work and thousands of document pages created. Even during this major undertaking, maintenance projects continued and a dam safety inspection and movement monitoring process was developed.  

1990s multi