Spirit
Special Announcements
On this page:
Stats Amenities Gallery Hourly Data Water Levels and Gate Report Water Level Report Land Use and RecreationThe Spirit Development, the second of the five engineered reservoirs in the system, is located on the Spirit River in Lincoln County near Tomahawk, Wisconsin. The impoundment consists of Spirit Reservoir. The high-head dam is composed of a concrete gated spillway, two earthen dikes, one on each side of the spillway, that span the original river channel. The Spirit Dam discharges directly into the Grandmother Hydroelectric Plant pond on the Wisconsin River at river mile 118. The area surrounding the facility contains a popular tailwater fishing area and a boat landing for the reservoir near to the dam.
(Ft. NGVD): 1437.88
(MCF): 672
(Feet): 25ft.
(Ft. NGVD): 1424.88
(MCF): 666
(Miles): 55mi.
Amenitities:
Spirit Hourly Data
Spirit Water Levels and Gate Report
Spirit Water Level Report
Spirit History
Plans for the Spirit reservoir began in 1912.
Planning, studies, and field surveys of the area for the second of Wisconsin Valley Improvement Company’s engineered reservoirs began in 1912 just as the company’s first engineered reservoir, Rice, was being completed. Construction for the dam was authorized by the Railroad Commission of Wisconsin on December 11, 1920, and approved by the company at its 1922 annual meeting. Construction began shortly after, with W.P. Ireland as construction superintendent at the dam. It was reported that 60 men were working at the site on July 20, 1922. There were also 27 teams and a caterpillar tractor that pulled three 1-yard automatic scoops. An news article noted that about 1,000 yards of dirt were being moved a day, and that 800 (wooden) piles were to be driven for the foundation. Major construction was completed my the end of 1922, including the concrete spillway on wood bearing piling and a sheet steel piling cut-off box, two steel tainter gates and two stationery hand-operated gate hoists with chains. Those original hand-operated gate hoists were replaced in 1928 with a single hand-operated traveling gate hoist that was manually pushed into position over each gate, with an eventual change to a gasoline engine powered hoist installed in 1936. Labor Day of 1941 came with a catastrophic failure of a portion of the earthen embankment due to an overtopping caused by a large amount of debris pilling in front of the dam gates, with effects of the breach seen south through the city of Wausau. Reconstrcution of the breach area began immediately in 1941, and with the approval of from the Public Service Commision in 1942, additional construction work commenced trough 1942 and 1943 to raise the concrete abutments, wingwalls, and piers four feet. Other portions of the hoists and tracks were reused, a new bridge was constructed, a 3-foot wooden vertical extension was added to the top of the steel gates, and the earthen dikes were all raised three feet.
Land Use and Recreation
WVIC lands are generally open to the public without discrimination. There are a few areas near our dams and infrastructure where public access and use is prohibited for your safety. We do have guidelines for recreational activities, like hunting, fishing, boating, trapping, and more. Learn more about the rules and guidelines for using WVIC lands.
Learn More >>Private Use of WVIC Land
Strictly limited individual private use of WVIC property is possible with permission and the assignment of a Use License Agreement obtained through WVIC. Learn more about what is and is not allowed to be constructed.
Learn More >>