Rice
Special Announcements
On this page:
Stats Amenities Gallery Hourly Data Water Levels and Gate Report Water Level Report Land Use and RecreationThe Rice Development, the first of the five engineered reservoirs in the system, is located on the Tomahawk River in Lincoln and Oneida Counties near Tomahawk, Wisconsin. The impoundment consists of three lakes, Rice Flowage (also known as Lake Nokomis), Bridge, and Deer, connected by channels. The area contains a popular tailwater fishing area and a boat landing for the reservoir adjacent to the dam. WVIC owns a “strip” of upland completely surrounding the reservoir lending to an interesting mix of publicly available recreation opportunities and privately owned boathouses and piers.
(Ft. NGVD): 1463.25
(MCF): 1922
(Feet): 62ft.
(Ft. NGVD): 1448.25
(MCF): 1698
(Miles): 80mi.
Amenitities:
Rice Hourly Data
Rice Water Levels and Gate Report
Rice Water Level Report
Rice History
Planning for the first of Wisconsin Valley Improvement Company’s engineered reservoirs began in 1908 shortly after the company’s inception.
The franchise rights to operate a dam in this general location were acquired from the Tomahawk River Improvement Company on July 24, 1911, with construction beginning later that year. Final work was completed in 1912, with the structure originally containing only one operating gate used for flow needs, and the reservoir was partially filled by September. The other two gate sections were designed to be manipulated by removing “stoplog” pieces with a crane for additional flow requirements. Major work came again in 1916-1917 to completely replace portions of the concrete piers and abutment walls on the main dam structure by diverting river flow through a wide gap created in the south earthen dike. Other wooden portions of the original structure were also replaced with concrete at this time and over the course of the following two years. The original wooden bridge was changed to concrete in 1921, while the original wooden radial gate was replaced with steel in 1922. The dam was then in service for 30+ years before another major project involving the addition of a second steel radial gate in one of the original “stoplog” or “needle” bays in 1955 with other changes made to the stationary hoist by creating a track allowing it to travel between the two gates for use. Structural changes were made to the upstream wingwalls in 1977 and 1978 by creating timber wingwalls sitting on a concrete foundation. The next major change happened in 2015 with the replacement of the hoisting mechanism that traveled from gate to gate on a track to new dedicated electric hoists on both gates that no longer need to be manually pushed into place to operate different gates, saving time and reducing the physical toll of moving them by hand. The latest large-scale change happened in 2024 with the installation of vertical steel-sheet-piling into the earthen embankment and tied into the front of the concrete structure to create a physical “cut-off” wall along the length of the main dikes. Other work was done to replace the deteriorating concrete work-bridge and to add two new fishing piers in the tailwater fishing area, making this one of our most advanced structures in the WVIC system.
Land Use and Recreation
WVIC lands are generally open to the public without discrimination. There are a few areas near our dams and infrastructure where public access and use is prohibited for your safety. We do have guidelines for recreational activities, like hunting, fishing, boating, trapping, and more. Learn more about the rules and guidelines for using WVIC lands.
Learn More >>Private Use of WVIC Land
Strictly limited individual private use of WVIC property is possible with permission and the assignment of a Use License Agreement obtained through WVIC. Learn more about what is and is not allowed to be constructed.
Learn More >>