The Rainbow Development, one of the five engineered reservoirs in the system, is located on the Wisconsin River at river mile 58 in Oneida County near Lake Tomahawk, Wisconsin and is one of only two WVIC operated facilities located directly on the Wisconsin River. The area surrounding the facility contains a popular tailwater fishing area, access for down-river canoeing and kayaking, a boat landing for the reservoir adjacent to the dam, and the WVIC Maintenance Shop. The area surrounding the Rainbow Reservoir is mixture of private and public access, offering miles of undeveloped shoreline, islands, acres of boating and fishing, and several remote and rustic camp sites.   

Map RAI
Location: Oneida
Max Water Level
(Ft. NGVD):
1597.05
Area (Acres): 4165 acres
Gross Storage
(MCF):
2004
Max Depth
(Feet):
26ft.
Year Built: 1935
Minimum Water Level
(Ft. NGVD):
1579.05
Usable Storage
(MCF):
1987
Shoreline Length
(Miles):
63mi.

Amenitities:

Boat Landing
Boat Landing
Access
Access
Restrooms
Restrooms
Picnic Area
Picnic Area
Campground
Campground
Shore Fishing
Shore Fishing
Canoe Portage
Canoe Portage
Pier
Pier

Rainbow Hourly Data

Rainbow Water Levels and Gate Report

Rainbow Water Level Report

Rainbow History

RAI 1947 0015 RAI 1938 0009
<<
>>

The Rainbow Reservoir is one of the two final reservoirs developed within the WVIC system.

Built in 1935, this reinforced concrete dam created one of the two engineered reservoirs developed in the 1930s. The Wisconsin Valley Electric Company, an early electric provider in the central Wisconsin River valley, completed the first planning surveys of the area that would become the Rainbow Reservoir in 1929.  Wisconsin Valley Improvement Company applied for a construction permit from the Wisconsin Public Service Commission to build the Rainbow Dam in January 1935, received approval on April 9, and finalized construction of the dam later that same year. During the following year, on August 29, 1936, WVIC again applied to the Public Service Commission for a permit to raise the maximum water level of the reservoir by three feet (Rainbow and Pickerel Control dams were initially built to accommodate this), and to construct a diversion canal and the Pickerel Canal Dam for additional storage capacity in the Rainbow Reservoir and for an alternate means to run water out from the Pickerel Reservoir. The permit for the work and the additional storage were received while the construction was in progress on February 25, 1937, with the diversion canal and Pickerel Canal Dam coming into service in July 1937. The brick building structure still currently on the dam was constructed in the fall of 1940 to act as a small powerhouse containing an internal waterwheel and generator for electrical needs at the dam and surrounding construction site buildings. Modifications to the waterwheel and generator occurred during its nearly two decades of service, however, the buildings were ultimately connected to the utility power grid in 1957, and all the generating components have been removed and the compartments sealed off. WVIC once again applied to the Public Service Commission for a permit to raise the maximum water level of the reservoir by another three feet in December 1948 and was granted approval in February 1949, with work to raise the earthen dikes, increase the height of the dam’s concrete walls, raise the hoisting frames, and add vertical extensions to all five steel gates occurring throughout that same spring and summer. The next major change wouldn’t happen until 2008 when the original concrete roadway bridge, portions of which rested on the dam structure, was removed and rebuilt utilizing its own abutment wall design to completely span over the dam structure. Other concrete maintenance work has been completed over the last number of decades to repair some surface deterioration with little additional change to the structure. The latest major project in 2023 involved replacing the original D.J. Murray electric hoist that traveled from gate to gate on a track to new dedicated electric hoists on three gates that no longer need to be manually pushed into place to operate different gates, saving time and reducing the physical toll of moving them by hand. The D.J. Murray electric hoist is still on site and can be used to operate two of the five gates if the need ever arises. 

Land Use and Recreation

WVIC lands are generally open to the public without discrimination.  There are a few areas near our dams and infrastructure where public access and use is prohibited for your safety.  We do have guidelines for recreational activities, like hunting, fishing, boating, trapping, and more.  Learn more about the rules and guidelines for using WVIC lands. 