Public consultation is a structured process where Wisconsin Valley Improvement Company (WVIC) engages with stakeholders—including the public, state and federal agencies, and Indian Tribes throughout the term of the FERC license.  This process ensures public review and input regarding potential operational and environmental changes to the FERC license, Articles, and Management Plans. 

Header scholarship

Current Year Consultations

4/13/26: Long-on-Deerskin - WVIC notified the Agencies that with warmer temperatures in the forecast and above normal water in the snowpack, it was anticipated that the reservoir would soon fill and the 31 cfs maximum discharge would likely need to be exceeded to maintain the reservoir water level below the maximum.  

4/14/26: Long-on-Deerskin - Agencies approved managing the dam operations to protect life, health, and property. WVIC increased outflow from the minimum required 10 cfs to 98 cfs. The gate remained at that opening through 4/17/26 when outflow was reduced to approximately 60 CFS through 4/20/26, when outflow was further reduced to 24 CFS, which is below the licensed maximum flow of 31 CFS and the end of this consultation period.

5/13/26: Long-on-Deerskin -  WVIC provided a summary of operations from 4/14/26 to 4/23/26 detailing the daily headwater level and gate flow for the full exceedance time period.  

7/24/26: South Pelican - WVIC notified Agencies of low-water projections due to lack of precipitation.

7/24/26: North Pelican - WVIC notified Agencies of low-water projections due to lack of precipitation.

8/10/26: South Pelican - WVIC again notified Agencies of low-water projections due to lack of precipitation.

8/24/26: South Pelican - WVIC held update meeting with Agencies to notified that reservoir level would drop below the summer minimum due to lack of precipitation. Dam gate will be closed to match inflows to the reservoir.

8/24/26: North Pelican - WVIC held update meeting with Agencies to notified that reservoir level would drop below the summer minimum due to lack of precipitation. Dam gate will be closed to match inflows to the reservoir.

8/26/26: South Pelican - WDNR authorized run-of-river operations when reservoirs drop below summer minimum. 

8/26/26: North Pelican - WDNR authorized run-of-river operations when reservoirs drop below summer minimum. 

 